Evaluation Plan
Evaluation Plan - DOC Format
Our company, Digital Inventory System, will conduct evaluations
for each phase of StaTag’s development. These evaluations
will contain a checklist of deliverables needed at the end of each
phase. During these evaluations we will track our progress to date
then re-evaluate future productions and address any technical issues
or risk that have risen. We plan to evaluate our efficiency in maintaining
our scheduled budget, and its impact on our business’s present
and future success. In addition to this, we plan to track our product’s
impact on our customers in respect to its optimization within their
system.
Our project plan will continually be evaluated at the end of each
phase. Phase zero will be considered a success when we have secured
a SBIR grant.
Phase one will be considered a success when our prototype is fully
functional and has passed all testing.
Phase two will be considered a success when we have a real world
working model up and running in the hospital.
Phase three will be considered a success when our product reaches
full production and our company has reached a break-even point.
In addition to this our customers have to reach their break-even
point in order to deem this phase a success.
The evaluation plan is as follows:
Program Design Reviews
• Assessment of the project at the end of each phase
Technical Testing
• Evaluate the direction taken in design, development, and
testing of the project
o Prototype testing
o Integration testing
o Web interface testing
Quality Testing/Reviews
• Evaluate the processes used by team members to perform tasks
• Evaluate deliverables for completeness at the end of each
phase
• Evaluate any new or pending risks as they occur
Periodical Reporting
• Used to evaluate our efficiency in maintaining our scheduled
budget for this project
• Used to evaluate our progress at each phase
Our work break down structure outlines the time schedule we have
planned to follow.
|