Week of October 31st
--------------------
Assigned duties:
Todd - Work on overall visionary prototype and give presentation
Jerry - Create the Wellness Homepage
Brenda - Work on blood sugar level analysis
Chris - Work on getting food database information
Week of November 6th
--------------------
The project will be divided into the following parts and assigned to specific
team members for research and devolpment.
Part of Wellness Project Assigned To:
1. Blood Level Sugar Analysis and Diabetes Planner Brenda
2. Fitness and Workout Planner Jerry
3. Food and Diet Analysis Chris
4. Body Composition Analysis Todd
We will build a prototype that will take on all parts mentioned above. Everyone
will have to chance to program their individual parts of the project into the
main wellness prototype. This will give everyone a chance to dable with Visual
Basic 4.0, which is a good language to know. I think this is a good idea, each
of us taking on a different aspect of the project, and then designing them into
the overall prototype.
Everyone should have contributed to the prototype by creating forms for input and
output and linking them into the main prototype by next week. The wellness
prototype project is in D:\VB\WELLNESS on the PC in the cpi room.
Hopefully a presentation of the prototype can be given next week, with added
features.
Week of November 11/13/95
Interview with Dr. Swain of the Wellness Institute. Todd, Jerry, and Brenda
attended and asked questions. Interview lasted about a hour, and it was
taped. Jerry has volunteered to transcribe highlights of the interview.
Hopefully, we can take the information learned from the interview and apply
various aspects of it to our prototype model. The following proposed
improvements on the prototype should be made within 2 weeks time:
Jerry - fitness part of the program, add more functionality
Brenda - Improve the input part of Blood Sugar Analysis
Todd - Create the input part of Body Composition
Chris - Integrate food database into combo boxes on food input form.
Week of November 11/20/95
Gave team members time off for the holidays.
Week of November 11/27/95
Everyone should be thinking about what issues need to be covered in
presentation to the review board, as well as improve their area of the
prototype if necessesary. All information for the review board is
located in D:\VB\WELLNESS. This includes the prototype and the powerpoint
presentation. Please review all material and provide suggestions and/or
comments to the whole team.
This project was voted as BIG, and we need to fill a 25 minute time slot
during the final presentation.
Weel of December 12/4/95
The Review Board presentation is this friday. Please look over powerpoint
slide contained in D:\VB\WELLNESS and provide additional information where
pertainent.