TSPi Team Project CS 350 Fall 2005 v. 11/21/05 Item Description Due Date(s) Reference (besides text, ch. 5) ---- ----------- ----------- --------- Student info Background info 10/24/05 Web, announcements & requested team Role Pref Your preferred 10/31/05 Slide 29 of role in the team slide set 6 Goals Team goals, role 11/28/05 Slide 18, 24, 26 goals & individual of slide set 6 goals WEEK Report weekly within 3 days Slide 35 of (Minutes) progress of meeting slide set 7 STRAT What you plan to 11/29/05 Slide 31 of implemement slide set 7 SUMS Plan Estimates of code 11/29/05 Slide 32 of sizes slide set 7 SUMS Actual As above but with 12/29/05 as above Actual sizes added TASK Form For each task: who, 11/29/05 Slide 2, 3 of Plan how big, how long, slide set 9 when TASK Form As above but with 12/12/05 As above Actual actual values added SCHEDULE Plan Weekly plan of 11/29/05 Slide 34 of Planned hrs, etc. slide set 7 SUMQ Plan Quality Plan 11/29/05 Slide 23 of Planned values only slide set 7 See comment 1 below SUMQ Actual As above, but with 12/12/05 As above Actual values added SUMP Summary of task 12/12/05 Slide 40 of data. See comment slide set 7 2 below Design doc One per module as completed, Pseudo-code OK but by 12/5/05 Inspection several, one per 12/12/05 Slide 16-18 of Report inspection, complete slide set 8 set per module text, pg. 403 Issue Tracking One per team 12/12/05 Text, pg. 405 Log Defect Rec. One per person 12/12/05 Text, pg. 409 Log unchanged Test Log per module 12/12/05 Slide 15 of slide set 9 SCHEDULE Plan Weekly actual, 12/12/05 Slide 34 of etc. slide set 7 Team & Peer One per person 12/13/05 Text, pg. 413 but include Eval. both team names and roles Process One per person 12/13/05 Text, pg. 415 Improvement Proposal Submission One per team, list 12/13/05 Based on this list Checklist everything submitted by team with date & person submitting --------- Final Exam: In class, open book, Dec. 13, 8:30-11:30 ------------------------------- (1) For the SUMQ form, include only the following: Summary rates LOC/hr % Reuse (of total LOC) % New Reuse (of new and changed LOC) Percent defect-free (PDF) In compile In unit test In build and integration Defect/LOC found DLD review DLD inspection Code review Compile Code Inspection Unit test Build and integration Defect ratios Code review/compile DLD review/Unit test Review rates DLD lines/hr Code LOC/hr Inspection rates DLD lines/hr Code LOC/hr Defect removal rates (Defect/hr) DLD review DLD inspection Code reivew Compile Code inspection Unit test Build & integration Phase yields DLD review DLD inspection Code review Compile Code inspection Build & integration Process yields % before compile % before unit test % before build and integration % before system delivery (2) For the SUMP form, include only the following: Product size Detail design lines Base LOC Modified LOC Added LOC Reused LOC Total Added and Modified LOC Total LOC Total New Reused Time in phase (Same as TASK phases) Defect removed (Same as TASK phases)