TSPi Team Project CS 350 Spring 2005 v. 4/18/05 Item Description Due Date(s) Reference (besides text, ch. 5) ---- ----------- ----------- --------- Student info Background info 2/23/05 Slide 2 of & requested team slide set 4 members Role Pref Your preferred 3/21/05 Slide 29 of role in the team slide set 7 Goals Team goals, role 4/12/05 Slide 4 of goals & individual slide set 8 goals Initial Minutes of initial 4/10/05 Slide 22 of Minutes team meeting slide set 9 Weekly Report weekly within 3 days Slide 22 of Minutes progress of meeting slide set 8 STRAT(1) What you plan to 4/15/05 Slide 18 of implemement slide set 8 SUMS Plan Estimates of code 4/15/05 Slide 19 of sizes slide set 8 SUMS Actual As above but with 4/29/05 as above Actual sizes added TASK Form For each task: who , 4/18/05 Slide 20 of Plan how big, how long, slide set 8, when & slide 19 of slide set 9 TASK From As above but with 4/29/05 as above Actual actual values added SCHEDULE Plan Weekly plan of 4/15/05 Slide 21 of Planned hrs, etc. slide set 8 SUMQ Plan(2) Quality Plan 4/18/05 Slide 23 of Planned values only slide set 8 SUMQ Actual As above, but with 4/29/05 as above Actual values added SUMP(3) Summary of task 4/18/05 Slide 27 of data slide set 8 Design doc One per module as completed, Pseudo-code OK but by 4/29/05 Inspection several, one per 4/29/05 text, pg. 403 Report inspection, complete set per module Issue Tracking One per team 4/29/05 text, pg. 405 Log Defect Rec. One per person 4/29/05 text, pg. 409 Log unchanged Test Log per module 4/29/05 unchanged Team & Peer One per person 4/30/05 text, pg. 413 but include Eval. both names and roles+ Process One per person 4/30/05 text, pg. 415 Improvement Proposal Submission One per team, list 4/29/05 based on this list Checklist everything submitted by team with date & person submitting --------- Final Exam: In class, open book, May 4, 3:35-6:45 ------------------------------- (1) Except for possible extra credit, this is pretty much decided for you. (2) For the SUMQ form, include only the following: Summary rates LOC/hr % Reuse (of total LOC) % New Reuse (of new and changed LOC) Percent defect-free (PDF) In compile In unit test In build and integration Defect/LOC found DLD review DLD inspection Code review Compile Code Inspection Unit test Build and integration Defect ratios Code review/compile DLD review/Unit test Review rates DLD lines/hr Code LOC/hr Inspection rates DLD lines/hr Code LOC/hr Defect removal rates (Defect/hr) DLD review DLD inspection Code reivew Compile Code inspection Unit test Build & integration Phase yields DLD review DLD inspection Code review Compile Code inspection Build & integration Process yields % before compile % before unit test % before build and integration % before system delivery (3) For the SUMP form, include only the following: Product size Detail design lines Base LOC Modified LOC Added LOC Reused LOC Total Added and Modified LOC Total LOC Total New Reused Time in phase (Same as TASK phases) Defect removed (Same as TASK phases)