System Concept
Reviews
•
This is a review and approval of the recommended system concept
configured to satisfy the system requirements document.
The SCR is the decision point to proceed with the development of
the system specification.
Technical Reviews
• Evaluates the direction taken
in design, development, and testing of the project
• Includes System Design
Review (SDR) and
Critical Design Reviews (CDR)
Quality Reviews
• Evaluate the processes used
by team members to perform tasks
• Evaluate deliverables for compliance
with contractual requirements
• Recommend corrective and preventive
actions if necessary
• Includes the Test Readiness Reviews(TRR) and
Release Readiness Reviews(RRR)
Periodical Reporting
• Used to track progress of the
project
|