From CS 418/518 Fall 2012

CS418-F12: Project 1: Basic Message Board Operations

Contents (hide)

Assigned: Tuesday, Sep 11, 2012
Status Report: Tuesday, Sep 18, 2012
Due: Tuesday, Sep 25, 2012 - in-class demos

(Edited Sep 25 @ 10:15am - changed email reporting requirements -MCW)

Description

This project is the first step in building a fully-operational message board (similar to something like http://www.tigerfan.com). Your first assignment is to build the basic framework of the message board. You and your group partner should have already chosen an interesting topic for your message board.

Requirements

Grading

In-class status report (Sep 18)

In-class demo (Sep 25-27)

Each student will grade the aesthetic appearance of the other groups’ message boards

Grades should be available within one week

Submission

Recommendation

Retrieved from http://www.cs.odu.edu/~mweigle/CS418-F12/Proj1
Page last modified on September 25, 2012, at 10:11 AM