Risk Analysis:

See larger image





Rankings are based on highest (1) to lowest (7) risks that affect the project


Choose Ranking:  1  2  3  4  5  6  7
Ranking: 1 Risk Category: Technical
Probabilty / Consequence: 4 / 5 Risk Expected: 20
Problem: The group will not be able to make the desired components of the project to work properly together. This will increase testing time and increase the cost of the phases.
Mitigation: The group researches enough to provide feasible components to the product that have the best chances of working together with minimal adjustments.