Risk Analysis:
See larger image
Rankings are based on highest (1) to lowest (7) risks that affect the project
Choose Ranking: 
1
2
3
4
5
6
7
|
Ranking: 1 |
Risk Category: Technical |
Probabilty / Consequence: 4 / 5 |
Risk Expected: 20 |
Problem: The group will not be able to make the desired components of the project to work properly together. This will increase testing time and increase the cost of the phases. |
Mitigation: The group researches enough to provide feasible components to the product that have the best chances of working together with minimal adjustments. |
|
|