Risk Analysis:

See larger image





Rankings are based on highest (1) to lowest (7) risks that affect the project


Choose Ranking:  1  2  3  4  5  6  7
Ranking: 3 Risk Category: Technical
Probabilty / Consequence: 2 / 3 Risk Expected: 6
Problem: Will the components be durable enough to last in a classroom setting and long enough to prevent user complaints and unnecessary future costs to the company and possible revision of product.
Mitigation: Provide components that allow the best results yet still maintain cost effectiveness stated in risk 2.