Risk Analysis:
See larger image
Rankings are based on highest (1) to lowest (7) risks that affect the project
Choose Ranking: 
1
2
3
4
5
6
7
|
Ranking: 2 |
Risk Category: Cost |
Probabilty / Consequence: 3/4 |
Risk Expected: 12 |
Problem: Will the final product be cost effective enough that will promote purchases. |
Mitigation: Create a Work Breakdown Structure (WBS) and plans that best suit to avoid this problem as well as research the components to determine more cost effective ways to solve the problem. |
|
|